Question: answer plz a) Based on the Dodge-Romig Tables provided in the lecture slides, what single sampling plan should be used for a lot size of
answer plz
a) Based on the Dodge-Romig Tables provided in the lecture slides, what single sampling plan should be used for a lot size of 1500 , AOQL of 3%, and with the process average p estimated as 1.5% ? What is the associated LTPD? b) Based on the Dodge-Romig Tables, what single sampling plan should be used for a lot size of 2900 , LTPD of 1.0%, and with the process average p estimated to be 0.5% ? Identify the associated AOQL as well