Question: Appendix 4 Lead Time = 2 Weeks Safety Stock = 10 Units Order Quantity = Lot for Lot (produce or order exactly what is needed.

Appendix 4 Lead Time = 2 Weeks Safety Stock = 10Appendix 4 Lead Time = 2 Weeks Safety Stock = 10Appendix 4 Lead Time = 2 Weeks Safety Stock = 10

Appendix 4 Lead Time = 2 Weeks Safety Stock = 10 Units Order Quantity = Lot for Lot (produce or order exactly what is needed. 1 2 Period 3 4 5 Gross Requirements - 40 o 10 15 75 Scheduled Receipts On Hand Inventory 25 10 10 25 25 15 o 1075 Planned Order Relaeses The following transactions occur during period 1: 5 units of the scheduled receipt of 40 in period 1 are scrapped. 40 units of part N are disbursed in period 1. (The gross requirements of 40 are met.) Referring to Appendix 4, following a regeneration at the end of period 1, the record would show that all of the following are true EXCEPT: Select one: a. The planned order release for period 2 will be 10. . b. There will be 10 units of inventory at the end of period 3. c. The 15-unit gross requirement in period 4 can be met. o d. The planned order for period 4 will be exactly equal to the gross requirements for period 6. Referring to Appendix 4, assume that the 5 units of scrap were recorded properly and that 8 more parts, not previously shown by the records, were found. When the MRP record is updated for the beginning of period 2, the projected on hand balance for period 3 would be: Select one: a. Greater than 15 but less than or equal to 20 units. b. Less than or equal to 10 units. C. Greater than 20 units. d. Greater than 10 but less than or equal to 15 units

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!