Question: Assignment #2 MGMT 3020 Bakersfield Pools is about to work on a project to install a backyard pool and build an accompanying bathhouse. The installation

Assignment #2 MGMT 3020 Bakersfield Pools isAssignment #2 MGMT 3020 Bakersfield Pools is

Assignment #2 MGMT 3020 Bakersfield Pools is about to work on a project to install a backyard pool and build an accompanying bathhouse. The installation process is fairly well defined. Building the pool involves digging the foundation, pouring concrete, and ordering and installing a filtration system. The bathhouse work involves constructing the bathhouse, installing the additional required plumbing, and installing the necessary electrical work. The process is shown in the table below. Activity Immediate Predecessors Duration A B D E F Description Dig pool foundation Order filtration system Receive filtration system Pour concrete Install filtration system Construct bathhouse Install electrical wiring Install plumbing Connect water supply Test B A C D 10 1 9 3 13 23 2 3 2 2 H I J F F H E, G, I Answer the following questions. Ignore the possibility of crashing until part f). a) Draw the network diagram for the project. Calculate early start, early finish, late start, late finish, and slack times. b) Bakersfield Pools works all 7 days a week. The customer wants this pool completed in time for a birthday party in 27 days. Can it be done? Why or why not? (Note: this means the entire project must be completed.) c) The staff member who is in charge of pouring concrete wants to go on a two-week vacation starting in 12 days. Can Bakersfield Pools let him go when he wants? Why or why not? d) Equipment required to do task E (the installation of the filtration system) is currently undergoing repairs. Until it is repaired, no work can be done on task E. What is the latest day those repairs can be completed by without delaying the project? e) BP's regular electrician is on vacation, and a "temp" has been hired. The temporary electrician is not as productive as the regular electrician. Suppose it takes him 4 days to install the electrical wiring, as opposed to 2 days. Does this delay the project? Normal Duration Minimum Duration Activity Crash Cost (s/day) 50 25 A B D E F G H I J 10 1 9 3 13 23 2 3 2 2 8 1 5 3 12 21 1 2 1 1 165 60 150 150 210 100 f) The customer for whom the pool and bathhouse are being installed would like the project to be completed as swiftly as possible. As an incentive, the customer has offered to pay Bakersfield Pools an extra $250 for each day they can reduce the length of the project. Use the table above for crash cost and minimum duration information. What is the most economic duration of the project? How much extra profit would this generate for BP

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!