Question: Assist with the questions below 2 3 5 2 Question 4 Refer to Table I. This table shows your estimates of optimistic, likely and pessimistic

Assist with the questions below
Assist with the questions below 2 3 5 2 Question
2 3 5 2 Question 4 Refer to Table I. This table shows your estimates of optimistic, likely and pessimistic durations for package activities to be carried out by your in-house developers. Table 1: Estimated activity times for works Activity Optimistic time Likely time (weeks) Pessimistic time (weeks) (weeks) A-B 2 3 B-C 2 3 B-D 3 4 B-E 2 6 10 C-F 3 5 C-G 2 3 DH 4 5 E-F 10 15 F- 6 10 F-L 2 3 2 3 2 3 3 5 IK 10 16 HK 2 3 K-M 8 12 L-N 3 4 M-N 8 10 Required: 2. Using a programme evaluation and review technique (PERT) approach draw a package schedule showing the activities and critical path. (10 marks) b. Calculate the probability of this particular package being completed by week 55. (5 marks) OONNNMON CDW C. Describe the main stages involved in developing a draft master schedule (DMS) from an initial statement of works (SOW) and suggest which of these stages are likely to prove the most problematic in the context of the case study. (10 marks)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!