Question: Assuming the surface loading ( overflow ) rate of 3 5 m d and solids loading rate - 1 3 0 k g m -

Assuming the surface loading (overflow) rate of 35md and solids loading rate -130kgm-d determine the size of the final settling tank (SST) for an activated sludge plant to be designed fo following criteria/data.
(i) Wastewater flow =5MLD
(ii) Recycled flow =3000m*d
(iii) MLSS in the reactor =3000mgL
 Assuming the surface loading (overflow) rate of 35md and solids loading

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!