B, 5) A 0.3 E, 7 C. 10. Referring to the network diagram of problem 3, use the following information to determine the probability of completing the project by time 22: OPTIMISTIC TIME MOST LIKELY TIME PESSIMISTIC TIME ACTIVITY B C D E 2 1 1 3 2 2 3 5 4 2 7 6 7 9 2 9