Question: (b) Non-conformities were found in below observations, through checking with ISO/IEC 17025, propose the corrective action for each of the nonconformities. [30 marks] i) During

(b) Non-conformities were found in below observations, through checking with ISO/IEC 17025, propose the corrective action for each of the nonconformities. [30 marks]

i) During the external audit, the auditor observed that the laboratory has participated in proficiency program (LGC TOYTEST Round 63), however, the measurement result of kinetic energy of a projectile was reported as unsatisfactory. The cause(s) of the unsatisfactory result had not been identified at the dates of the assessment visit.