Question: (b) Non-conformities were found in below observations, through checking with ISO/IEC 17025, propose the corrective action for each of the nonconformities. [30 marks) i) During

(b) Non-conformities were found in below
(b) Non-conformities were found in below observations, through checking with ISO/IEC 17025, propose the corrective action for each of the nonconformities. [30 marks) i) During the external audit, the auditor observed that the laboratory has participated in proficiency program (LGC TOYTEST Round 63), however, the measurement result of kinetic energy of a projectile was reported as unsatisfactory. The cause(s) of the unsatisfactory result had not been identified at the dates of the assessment visit. ii) The laboratory maintained a list of controlled test record forms for use by testing personnel. However, some forms were found not matching with current practice of the laboratory. There was no evidence showing that these controlled forms were periodically reviewed for validity

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!