Question: b . Using the results from part ( a ) , determine the gross requirements schedule for the DRAM chips, which are ordered from an

b. Using the results from part (a), determine the gross requirements schedule for the DRAM chips, which are ordered from an outside supplier. The order cost is $25.00, and the holding cost is $0.01 per chip per week. What order schedule with the vendor results if the EOQ formula is used to determine lot size?