Question: b . Using the results from part ( a ) , determine the gross requirements schedule for the DRAM chips, which are ordered from an
b Using the results from part determine the gross requirements schedule for the DRAM chips, which are ordered from an outside supplier. The order cost is $ and the holding cost is $ per chip per week. What order schedule with the vendor results if the EOQ formula is used to determine lot size?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
