Question: Baa Constructions Site Waste Minimisation Plan Design Plan Project Description; Design Plan to Achieve Energy Ratings Material Type Climate Zone: __ __ Location : Root


Baa Constructions Site Waste Minimisation Plan Design Plan Project Description; Design Plan to Achieve Energy Ratings Material Type Climate Zone: __ __ Location : Root Roof Insulation Walls Wall Insulation Slab/ Footings Orientation Passive Heating And Cooling Thermal mass Insulation (walls, roof and floor) Shading Glazing Skylights Solar Hot Water Service Rainwater Tank (min 2000 litres) Other: Windows placed in all rooms to maximise light and ventilation all throughout dwelling
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
