Question: BackFill Systems allocates manufacturing overhead based on machine hours. Each connector should require 13 machine hours. According to the static budget, BackFill expected to incur

BackFill Systems allocates manufacturing overhead based on machine hours. Each connector should require 13 machine hours. According to the static budget, BackFill expected to incur the following:

1,300 machine hours per month (100 connectors * 13 machine hours per connector)

$6500 in variable manufacturing overhead costs

$5550 in fixed manufacturing overhead costs

During August, BackFill actually used 400 machine hours to make 85 connectors and spent $5,500 in variable manufacturing costs and $8800 in fixed manufacturing overhead costs. Calculate the variable overhead efficiency variance for BackFill.

a. $3,525 F

b. $3,500 U

c. $25 F

d. $7,025 F

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!