Question: BackFill Systems allocates manufacturing overhead based on machine hours. Each connector should require 13 machine hours. According to the static budget, BackFill expected to incur
BackFill Systems allocates manufacturing overhead based on machine hours. Each connector should require 13 machine hours. According to the static budget, BackFill expected to incur the following: 1,300 machine hours per month (100 connectors x 13 machine hours per connector) $6,500 in variable manufacturing overhead costs $8.115 in fixed manufacturing overhead costs During August, BackFill actually used 900 machine hours to make 80 connectors and spent $5,400 in variable manufacturing costs and $8,800 in fixed manufacturing overhead costs. BackFill's standard variable manufacturing overhead allocation rate is O A. $6.24 per machine hour OB. $5.00 per machine hour OC. $11.24 per machine hour. OD. $7.22 per machine hour
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
