Question: BackFill Systems allocates manufacturing overhead based on machine hours. Each connector should require 1 0 machine hours. According to the static budget, BackFill expected to
BackFill Systems allocates manufacturing overhead based on machine hours. Each connector should require machine hours. According to the static budget, BackFill expected to incur the following
machine hours per month connectors machine hours per connector
$ in variable manufacturing overhead costs
$ in fixed manufacturing overhead costs
During August, BackFill actually used machine hours to make connectors and spent $ in variable manufacturing costs and $ in fixed manufacturing overhead costs. BackFill's standa variable manufacturing overhead allocation rate is