Question: Based on the above table determine the total waste cost per production resource and process. The standard labor capacity is 3 hours per 200 lb.
Based on the above table determine the total waste cost per production resource and process.
The standard labor capacity is 3 hours per 200 lb.
The standard machine capacity is 1.5 hours per 100 lb including loading and unloading operations.
The downtime cost is $150/hr.
The material cost is $65/lb.
After determine the resource (labor, material, equipment) cost, select the major offender resource.
PLEASE DONT ANSWER WITH A PICTURE.