Question: Type or paste question Operation DURATION MIN QTY Transfer material from carts. 25 300LBS Load machine 30 300LBS Machine process 350 245LBS Unload machine 20
Type or paste question
| Operation | DURATION MIN | QTY |
| Transfer material from carts. | 25 | 300LBS |
| Load machine | 30 | 300LBS |
| Machine process | 350 | 245LBS |
| Unload machine | 20 | 245LBS |
| Inspect product | 25 | 245LBS |
| Waiting for release product | 20 | 245LBS |
| Transfer product | 35 | 245LBS |
| Storage product. | 30 | 245LBS |
| Based on the above table determine the total waste cost per production resource and process. | |||||||
| The standard labor capacity is 3 hours per 200 lb. | |||||||
| The standard machine capacity is 1.5 hours per 100 lb including loading and unloading operations. | |||||||
| The downtime cost is $150/hr. | |||||||
| The material cost is $65/lb. | |||||||
| After determine the resource (labor, material, equipment) cost, select the major offender resource. | |||||||
here
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock