Question: Based on the above, the first activity that is selected to reduce the project duration is project duration at the CRASH POINT (the minimum possible

Based on the above, the first activity that is selected to reduce the project duration is project duration at the CRASH POINT (the minimum possible duration for the project) is days. The indirect cost with normal times is $300 and there is a savings $25 per period reduced. The crash cost (cost at the CRASH POINT) is $                    . 

The optimum cost-time schedule (the schedule with minimum total cost and corresponding time) is Note Enter the values for each item within square brackets.
Crash cost (slope) Task Name Normal Normal Crash Predecessor time cost time

Crash cost (slope) Task Name Normal Normal Crash Predecessor time cost time 35 100 3. 10 B. 4 30 80 90 25 D. AB 3. 25 B.C 95 2. D. 100 90 30 D.E 20 H. 35 F.G.H 1. 85 n54 24 24

Step by Step Solution

3.50 Rating (167 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

chashing detivityA by itany Additional rasheng Crash leter ine cort 20f crashing2 set... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!