Based on the above, the first activity that is selected to reduce the project duration is project
Fantastic news! We've Found the answer you've been seeking!
Question:
Based on the above, the first activity that is selected to reduce the project duration is project duration at the CRASH POINT (the minimum possible duration for the project) is days. The indirect cost with normal times is $300 and there is a savings $25 per period reduced. The crash cost (cost at the CRASH POINT) is $ .
The optimum cost-time schedule (the schedule with minimum total cost and corresponding time) is Note Enter the values for each item within square brackets.