Question: Based on the following table, compute the following: 1- Duration of project: 2-LS (F) = 3- Ef (D) = 4-Float (A)= Starts after Duration

Based on the following table, compute the following: 1- Duration of project: 2-LS (F) = 3- Ef (D) = 4-Float (A)= Starts after Duration 3 Activity A 4 B 2 A 1 D D 2 E A 2 F C, B 5 G G 4 H
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
