Question: Based on the network diagram and resource schedule below, using the parallel method heuristic and assuming only 3 resources are available, determine the period in

Based on the network diagram and resource schedule below, using the parallel method heuristic and assuming only 3 resources are available, determine the period in which the overall project will actually be completed.
\table[[ID,(ES resource load chart),3,,5,6,4,8,9,10,12,13,],[RES,DUR ,2.,ES,LF,SL,,1,2,,7,11,\table[[3,14]]],[1,2P,2,0,2,0,2,2,,,M,,47,111,min,4,,,,],[2,2P,6,2,10,2,,,2,2,2,2,2,2,,,,,,],[3,2P,4,2,6,0,,,2,2,2,2,,,,H,,,,],[4,10,2,2,10,6,,,1,1,,,=,=,)H,,,,,],[5,1P,2,6,10,2,,,,,,,1,1,H1H,,,,,],[6,1P,4,6,10,0,,,,,,,1,1,1,1,,,,],[7,1P,2,10,12,0,,,,,,,,,,,1,1,,],[,,otal re:,sour,elolas,,2P,2P,5P,5P,4P,4p,4P,4P,ip,IP,1P,,,]]
 Based on the network diagram and resource schedule below, using the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!