Question: Based on the network diagram and resource schedule below, using the parallel method heuristic and assuming only 3 resources are available, determine the period in

Based on the network diagram and resource schedule below, using the parallel method heuristic and assuming only 3 resources are available, determine the period in which the overall project will actually be completed.
 Based on the network diagram and resource schedule below, using the