Question: basic road layer - works design option drawings ) DCM 2 6 0 1 PROJECT Consequently, you are also required to put together Volume 1

basic road layer-works design option drawings)DCM2601 PROJECT
Consequently, you are also required to put together Volume 1 and 3 only on table 4 below. From the perspective of the engineer. Your document must be in the same format as the table below (Headings and sub-headings).
Table 4: Standard Headings and sequencing of documents when soliciting tenders (Construction Industry Development Board (CIDB),2019)
\table[[\table[[Volumes]],Contents,],[Number,Description,Number,Heading,],[Volume 1,\table[[Tendering],[Procedures]],Part T1: Tending Procedures,],[\table[[T 1.1,]],\table[[Tender Notice and],[Invitation Tender]],\table[[Ensures that everything the],[employer requires a tenderer to],[submit with the tender is included],[or returned with the tender],[submission]]],[\table[[T1.2]],Tender Data,\table[[Establisher the rules from the time],[a tender is invited to the time a],[tender is awarded.]]],[Volume 2,\table[[Returnable],[Documents]],Part T2: Returnable documents,],[T2.1,List of Returnable,],[C1.1,\table[[Form of Offer and],[Acceptance]],],[C1.2,Contract Data,],[C2.2,\table[[Activity Schedules],[or Bill of Quantities]],],[T2.2,\table[[Returnable],[Schedules]],],[,,Part C1: Agreement and Contract Data,],[,,C1.2,Pricing Instruction,\table[[Identifies the],[applicable condition of contract],[and associated contract specific],[data that collectively describe the],[risks, liabilities and obligation of],[the contracting Parties and the],[procedures for the administration],[of the contract.]]]]
4DCM2601 PROJECT
Project Brief
A 1 km (6 m wide) off R 30, facilitates access to the agricultural college, which plays a major role in the province's agricultural sector. The road was initially paved with asphalt 25 years ago and carries the greatest volume of traffic in the community, due to outside travelers, the road needs upgrading due to severe distress on the surface and pavement structure.
The Department of Transport (Free state) is proposing a full rehabilitation of the road, which includes re-design and construction. The project must be as labour intensive as possible to alleviate unemployment within the community.
The Department of transport (Free State) has approached your engineering company, you as a project engineer to design this project. As a project engineer in charge, your job is to propose 2 design options (with basic road layer-works design option drawings) and considerations for the chosen design, present it to the client using MS PowerPoint in not more than 5 slides. 2 of the presentation slides should speak to labour intensive activities identified, then develop the full tender document for the chosen option only(include considerations for the chosen design) that will be advertised for the tender bids, including the Scope of Work, Work Breakdown Structure, Bill Of Quantities with an initial price quotation, Project Specification, and an Execution Plan/Bar Chart.
3DCM2601 PROJECT
Project Brief
A 1 km (6 m wide) off R 30, facilitates access to the agricultural college, which plays a major role in the province's agricultural sector. The road was initially paved with asphalt 25 years ago and carries the greatest volume of traffic in the community, due to outside travelers, the road needs upgrading due to severe distress on the surface and pavement structure.
The Department of Transport (Free state) is proposing a full rehabilitation of the road, which includes re-design and construction. The project must be as labour intensive as possible to alleviate unemployment within the community.
The Department of transport (Free State) has approached your engineering company, you as a project engineer to design this project. As a project engineer in charge, your job is to propose 2 design options (with basic road layer-works design option drawings) and considerations for the chosen design, present it to the client using MS PowerPoint in not more than 5 slides. 2 of the presentation slides should speak to labour intensive activities identified, then develop the full tender document for the chosen option only(include considerations for the chosen design) that will be advertised for the tender bids, including the Scope of Work, Work Breakdown Structure, Bill Of Quantities with an initial price quotation, Project Specification, and an Execution Plan/Bar Chart.
3
basic road layer - works design option drawings )

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!