Question: basic road layer - works design option drawings ) DCM 2 6 0 1 PROJECT Consequently, you are also required to put together Volume 1
basic road layerworks design option drawingsDCM PROJECT
Consequently, you are also required to put together Volume and only on table below. From the perspective of the engineer. Your document must be in the same format as the table below Headings and subheadings
Table : Standard Headings and sequencing of documents when soliciting tenders Construction Industry Development Board CIDB
tabletableVolumesContents,NumberDescription,Number,Heading,Volume tableTenderingProceduresPart T: Tending Procedures,tableT tableTender Notice andInvitation TendertableEnsures that everything theemployer requires a tenderer tosubmit with the tender is includedor returned with the tendersubmissiontableTTender Data,tableEstablisher the rules from the timea tender is invited to the time atender is awarded.Volume tableReturnableDocumentsPart T: Returnable documents,TList of Returnable,CtableForm of Offer andAcceptanceCContract Data,CtableActivity Schedulesor Bill of QuantitiesTtableReturnableSchedulesPart C: Agreement and Contract Data,CPricing Instruction,tableIdentifies theapplicable condition of contractand associated contract specificdata that collectively describe therisks liabilities and obligation ofthe contracting Parties and theprocedures for the administrationof the contract.
DCM PROJECT
Project Brief
A km m wide off R facilitates access to the agricultural college, which plays a major role in the province's agricultural sector. The road was initially paved with asphalt years ago and carries the greatest volume of traffic in the community, due to outside travelers, the road needs upgrading due to severe distress on the surface and pavement structure.
The Department of Transport Free state is proposing a full rehabilitation of the road, which includes redesign and construction. The project must be as labour intensive as possible to alleviate unemployment within the community.
The Department of transport Free State has approached your engineering company, you as a project engineer to design this project. As a project engineer in charge, your job is to propose design options with basic road layerworks design option drawings and considerations for the chosen design, present it to the client using MS PowerPoint in not more than slides. of the presentation slides should speak to labour intensive activities identified, then develop the full tender document for the chosen option onlyinclude considerations for the chosen design that will be advertised for the tender bids, including the Scope of Work, Work Breakdown Structure, Bill Of Quantities with an initial price quotation, Project Specification, and an Execution PlanBar Chart.
DCM PROJECT
Project Brief
A km m wide off R facilitates access to the agricultural college, which plays a major role in the province's agricultural sector. The road was initially paved with asphalt years ago and carries the greatest volume of traffic in the community, due to outside travelers, the road needs upgrading due to severe distress on the surface and pavement structure.
The Department of Transport Free state is proposing a full rehabilitation of the road, which includes redesign and construction. The project must be as labour intensive as possible to alleviate unemployment within the community.
The Department of transport Free State has approached your engineering company, you as a project engineer to design this project. As a project engineer in charge, your job is to propose design options with basic road layerworks design option drawings and considerations for the chosen design, present it to the client using MS PowerPoint in not more than slides. of the presentation slides should speak to labour intensive activities identified, then develop the full tender document for the chosen option onlyinclude considerations for the chosen design that will be advertised for the tender bids, including the Scope of Work, Work Breakdown Structure, Bill Of Quantities with an initial price quotation, Project Specification, and an Execution PlanBar Chart.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock