Question: Below is the actual demand for skids for a distribution centre along with the forecasts for the last three periods. Calculate the mean absolute percent

Below is the actual demand for skids for a distribution centre along with the forecasts for the last three periods. Calculate the mean absolute percent error rounded to one decimal place. Do NOT include the percent sign. Period Actual Demand Forecast 1 673 625 2 709 700 3 752 800