Question: board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to

 board assembly time. After each batch is completed, the operator moves

board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. two operations. Packaging and labeling requires 6 minutes per unit. percentage to one decimal place. 2. Move time in this process could best be reduced by: a. Doing nothing. b. Changing the layout from a process orientation to a product orientation. c. Increasing batch sizes. d. Eliminating the testing step. e. Hiring more workers