Question: Lead Time board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9

Lead Time board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9 minutes to complete. these two operations. Packaging and labeling requires 10 minutes per unit. Required: percentage to one decimal place. 2. Move time in this process could best be reduced by: a. Doing nothing. b. Changing the layout from a process orientation to a product orientation. c. Increasing batch sizes. d. Eliminating the testing step. e. Hiring more workers.