Question: BPM307 Answer ALL questions in this section. Question 1 Existing Building New Building Element Total Element Element UOM Total Cost Quantity Quantity Cost (S$) (EUQ)
BPM307

Answer ALL questions in this section. Question 1 Existing Building New Building Element Total Element Element UOM Total Cost Quantity Quantity Cost (S$) (EUQ) UOM (EUQ) (S$ 1. Substructure 122,800 520 m 700 m 2. Superstructure N.A. 2A Frame 43,500 520 m 700 m2 2B Upper Floors 5,900 m 75 m 2C Roof 5,000 10 m 15 m 2D Stairs 272,000 520 m 700 m 2E External Walls 255,000 560 m 760 m 2F Windows & 20 External Doors 21,000 15 m2 2G Internal Walls and 10 Partition 28,500 25 m2 m 2H Internal Doors 33,000 3. Finishes N.A. 3A Wall Finishes 9,500 80 m 120 3B Floor Finishes 13,200 60 m 80 m 3C Ceiling Finishes 23,600 60 m 45 m 4 Fittings and Furnishings 12,300 5. Services N.A. 5A Sanitary Appliances 29,600 5B Ventilating System 9,500 5C Electrical Installation 45,000 5D Gas Installation 24,000 5E Lifts and Conveyors 18,900 5F Protective Installation 113,300
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
