Question: Calculate the expected project duration and its standard deviation for the construction project that consists of the following activities: Activity A B C D E

Calculate the expected project duration and its
Calculate the expected project duration and its
Calculate the expected project duration and its standard deviation for the construction project that consists of the following activities: Activity A B C D E F G Expected Duration (days) 3 3 9 6 5 9 9 Standard Deviation (days) 2 4 3 3 4 6 4 D F Start B E End O Z Probability Probability Z -2.0 0.02 -13 -1.0 -0.9 -0.8 -0.7 -0.6 -0.5 -0.4 -0.3 -0.2 0.1 0 0.07 0.10 0.16 0.18 0.21 0.24 0.27 0.31 0.34 0.38 0.42 0.46 0.50 0.98 0.93 0.90 0.84 0.82 0.79 0.76 0.73 0.69 0.66 0.62 0.58 0.54 0.50 +2,0 +1.5 +13 +1.0 +0.9 +0.8 +0.7 +0,6 +0.5 +0.4 +0.3 +0.2 +0.1 0 1) Expected Project Duration (1 Point) 2) Standard Deviation of Project Duration = (1 Point) 3) In a range estimating problem, it was found that the expected project cost is $5,000,000 and the standard deviation of the project cost = $100,000. For this project, 3a) Find the probability that the project cost will be between $4,850,000 and $5,200,000. (2 points) 3b) The project cost that provides 90% probability of not being exceeded. (2 points)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!