Question: can someone draw a future state value stream map for this - rban Haven Furniture ( UHF ) Urban Haven Furniture is a furniture manufacturer
can someone draw a future state value stream map for this rban Haven Furniture UHF
Urban Haven Furniture is a furniture manufacturer selling to retail stores. In the last few
years, the company has taken on a considerable volume. Resources have been assigned but
not with a production system focus. As a result, UHF has been receiving customer
complaints and hasnt been able to deliver on time.
After analysing the production and applying the principles of
Group Technology, UHF identified several product families.
This case concerns one product family glass tables, which
come in small S and medium size M
Customer complaints mostly relate to getting the wrong
components in their flat pack or the table being wobbly after
they assemble it Some of the customer complaints include the
following. I can't believe how unstable this table is One slight
bump and it wobbles like crazyThis table is a disaster
waiting to happen. During assembly, some of the screws stripped easily. Now, it wobbles
like crazy, and Im worried it's going to collapse any minuteSome of the hardware was
missing, I wasnt able to assemble the table
Furniture is a maketostock business. It currently takes over a month to get through the
company production processes.
Customer requirements
pieces per month
o Small TablesS
o Medium Tables M
An order from retail stores includes tables.
Several daily shipments per day by truck to customers.
Production Processes
Tables are made of three parts round glass, aluminium disc hardware, and timber legs.
While the glass is cut into a round shape, the discs are cut from aluminium coils. The
aluminium hardware is then glued into the glass.
At the same time, legs are made from wood lumbers. The wood is cut into standard pieces
and then shaped using a lathe. After sanding and coating, the legs are packaged together
with the glass and its aluminium hardware attached to it Finally, the flat pack is briefly
inspected to ensure all the components have been included.
Tempered glass is supplied by CrystalCraft Glassworks every fortnight.
Aluminium coils are supplied by AluCoil Producers every fortnight.
Wood lumbers are supplied by ForestHarvest Wood on a weekly basis.
Work Time
days in a month.
Oneshift operation in all production departments.
Eight hours every shift.
Two minute breaks during each shift manual processes stop during breaks
Planned maintenance occurs once a month during work time and takes hours.
During maintenance, the production stops.
Production control department
Receives week forecast from retail shops.
Receives weekly orders from retail shops.
Issues weekly orders to suppliers.
Issues week schedule to glass and aluminium hardware areas.
Issues weekly build schedules to departments dedicated to the production of timber
legs.
Process Information
By walking around the factory, you are able to observe the following. Some of the processes
are dedicated to the glass table product family, while others are dedicated to multiple
product families.
Wood cutting
o Cycle time seconds
o Changeover time minutes
o Operator
o Observed inventory:
weeks of timber wood lumbers
sets of cut legs for small tables
sets of cut legs for medium tables
Lathe
o Cycle time seconds
o Changeover time minutes
o Operator
o Observed inventory:
sets of processed legs for small tables
sets of processed legs for medium tables
Sanding
o Cycle time seconds
o Changeover time
o Operator
o Observed inventory:
sets of sanded legs for small tables
sets of sanded legs for medium tables
Coating
o Cycle time second
o Changeover time
o Operator
o Observed inventory:
sets of coated legs for small tables
sets of coated legs for medium tables
Glass cutting
o Cycle time seconds
o Changeover time seconds
o Operator
o Observed inventory:
week of uncut tempered glass
glass table tops for small tables
glass table tops for medium tables
Metal cutting
o Cycle time seconds
o Changeover time
o Operator
o Observed inventory:
week of aluminium coils
sets of metal hardware for small tables
sets of metal hardware for medium tables
Assembly glass table top and aluminium hardware
o Total work time per piece seconds
o Changeover time
o operators
o Observed inventory:
assembled glass table tops for small tables
assembled glass table tops for medium tables
Package
o Total work time per piece seconds
o Changeover time
o operators
o Observed inventory:
small table flat packs
medium tables flat packs
Inspection
o Cycle time seconds
o Changeover time
o Operator
o Observed inventory:
inspected small table flat packs
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock