A foreman has determined the expected processing times at a machine for a set of jobs and now wants to sequence them. Given the following information, do the following: a. Determine the processing sequence using (1) MST, (2) SPT. (3) EDD, and (4) CR. For each sequence, cal- culate the average days late, the average flow time, and the average WIP b. Which rule is the best? Job Job Time (days) Due Date (days) a 4.5 10 b 6.0 17 12 5.2 1.6 d 27 2.8 18 3.3 19