Question: Case Problem R. C. COLEMAN R. C. Coleman distributes a variety of food products that are sold through grocery store and supermarket outlets. The company

Case Problem R. C. COLEMAN R. C. Coleman
Case Problem R. C. COLEMAN R. C. Coleman distributes a variety of food products that are sold through grocery store and supermarket outlets. The company receives orders directly from the individual outlets, with a typical order requesting the delivery of several cases of anywhere from 20 to 50 different products. Under the company's current warehouse operation, warehouse clerks dispatch order-picking personnel to fill each order and have the goods moved to the warchouse shipping area. Because of the high labor costs and relatively low productivity of hand order-picking, management has decided to automate the warehouse operation by installing a computer-controlled order-picking system, along with a conveyor system for moving goods from storage to the warehouse shipping area Immediate Activity Description Predecessor A Determine equipment needs B Obtain vendor proposals Select vendor AB D Order system E Design new warehouse layout F Design Warehouse G Design computer interface H Interface computer D,F,G 1 Install system DF J Train system operators H K Test system 1,J 1 1900 Optimistic Activity A B D E 6 2 8 7 Time (weeks) Most Probable Pessimistic 8 8 16 6 24 13 8 6 20 8 14 4 H 1 4 6 J K R.C. Coleman's director of material management has been named the project man-ager in charge of the automated warehouse system. After consulting with members of the engineering staff and warchouse management personnel, the director compiled a list of activities associated with the project. The optimistic, most probable, and pessimistic times (in weeks) have also been provided for each activity Managerial Report Develop a report that presents the activity schedule and expected project completion time for the warehouse expansion project. Include a project network and a critical path in the report. In addition, take into consideration the following issue: 1. R.C. Coleman's top management established a required 40-weck completion time for the project. Can this completion time be achieved considering real project completion time? 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!