Question: Case Problem R . C . COLEMAN R . C . Coleman distributes a variety of food products that are sold through grocery store and
Case Problem R C COLEMAN R C Coleman distributes a variety of food products that are sold through grocery store and supermarket outlets. The company receives orders directly from the individual outlets, with a typical order requesting the delivery of several cases of anywhere from to different products. Under the company's current warehouse operation, warehouse clerks dispatch orderpicking personnel to fill each order and have the goods moved to the warchouse shipping area. Because of the high labor costs and relatively low productivity of hand orderpicking, management has decided to automate the warehouse operation by installing a computercontrolled orderpicking system, along with a conveyor system for moving goods from storage to the warehouse shipping area Immediate Activity Description Predecessor A Determine equipment needs B Obtain vendor proposals Select vendor AB D Order system E Design new warehouse layout F Design Warehouse G Design computer interface H Interface computer DFG Install system DF J Train system operators H K Test system J Optimistic Activity A B D E Time weeks Most Probable Pessimistic H J K RC Coleman's director of material management has been named the project manager in charge of the automated warehouse system. After consulting with members of the engineering staff and warchouse management personnel, the director compiled a list of activities associated with the project. The optimistic, most probable, and pessimistic times in weeks have also been provided for each activity Managerial Report Develop a report that presents the activity schedule and expected project completion time for the warehouse expansion project. Include a project network and a critical path in the report. In addition, take into consideration the following issue: RC Coleman's top management established a required weck completion time for the project. Can this completion time be achieved considering real project completion time?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
