Question: Case Problem R . C . COLEMAN R . C . Coleman distributes a variety of food products that are sold through grocery store and

Case Problem R. C. COLEMAN R. C. Coleman distributes a variety of food products that are sold through grocery store and supermarket outlets. The company receives orders directly from the individual outlets, with a typical order requesting the delivery of several cases of anywhere from 20 to 50 different products. Under the company's current warehouse operation, warehouse clerks dispatch order-picking personnel to fill each order and have the goods moved to the warchouse shipping area. Because of the high labor costs and relatively low productivity of hand order-picking, management has decided to automate the warehouse operation by installing a computer-controlled order-picking system, along with a conveyor system for moving goods from storage to the warehouse shipping area Immediate Activity Description Predecessor A Determine equipment needs B Obtain vendor proposals Select vendor AB D Order system E Design new warehouse layout F Design Warehouse G Design computer interface H Interface computer D,F,G 1 Install system DF J Train system operators H K Test system 1,J 11900 Optimistic Activity A B D E 6287 Time (weeks) Most Probable Pessimistic 88166241386208144 H 146 J K R.C. Coleman's director of material management has been named the project man-ager in charge of the automated warehouse system. After consulting with members of the engineering staff and warchouse management personnel, the director compiled a list of activities associated with the project. The optimistic, most probable, and pessimistic times (in weeks) have also been provided for each activity Managerial Report Develop a report that presents the activity schedule and expected project completion time for the warehouse expansion project. Include a project network and a critical path in the report. In addition, take into consideration the following issue: 1. R.C. Coleman's top management established a required 40-weck completion time for the project. Can this completion time be achieved considering real project completion time? 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!