Question: CASE STUDY ON FACILTY YAYOUT DESIGN II In Willy Wonka's factory, main task is to assemble sub elements manually. There are eleveu work stations. The
CASE STUDY ON FACILTY YAYOUT DESIGN II In Willy Wonka's factory, main task is to assemble sub elements manually. There are eleveu work stations. The dimensions are 2012.5m. Willy Wonka needs help on redesigning the existing layout because of some reasons such as extra space requirement (70m2) and adding new products/customers, free spaces should le kept, space of existing assembly activities tried to be decreased etc. Workstations 1,2,3 can not bo moved. Material flow is shown with unit load (UL) Supply is applied by using KANBAN. KANBAN has three stopping points (umload and load) and at the end, final good is manufactured. What is your advice to Mr. Wonka? How do you redesign the existing layout
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
