Question: Chapter 6 Problems 1 & 2 An assembly line with 1 7 tasks is to be balanced. The longest task is 2 . 4 minutes,
Chapter Problems &
An assembly line with tasks is to be balanced. The longest task is minutes, and the total time for all tasks is minutes. The line will operate for minutes per day.
a What is the minimum number of workstations needed if the output rate is to be units per day?
b What cycle time will provide an output rate of units per day?
c What output will result if the cycle time is i minutes? ii minutes?
A manager wants to assign tasks to workstations to achieve an hourly output rate of units. Assume that the shop works minutes per hour ie no breaks
a Assign the tasks shown in the following precedence network times are on the nodes and are in minutes to workstations using the following heuristic rules:
i Assign the task with the most followers.
ii Tiebreaker: assign the task with the longest time.
b What is the efficiency?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
