Question: Chapter 6 Problems 1 & 2 An assembly line with 1 7 tasks is to be balanced. The longest task is 2 . 4 minutes,

Chapter 6 Problems 1&2
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day.
a) What is the minimum number of workstations needed if the output rate is to be 180 units per day?
b) What cycle time will provide an output rate of 125 units per day?
c) What output will result if the cycle time is (i)9 minutes? (ii)15 minutes?
A manager wants to assign tasks to workstations to achieve an hourly output rate of 33 units. Assume that the shop works 60 minutes per hour (i.e. no breaks).
a) Assign the tasks shown in the following precedence network ( times are on the nodes and are in minutes) to workstations using the following heuristic rules:
i) Assign the task with the most followers.
ii) Tiebreaker: assign the task with the longest time.
b) What is the efficiency?
 Chapter 6 Problems 1&2 An assembly line with 17 tasks is

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!