Question: Check My Work A small assembly line for the assembly of power steering pumps needs to be balanced. Precedence diagram is shown below. 0.6 0.1

Check My Work A small assembly line for the
Check My Work A small assembly line for the assembly of power steering pumps needs to be balanced. Precedence diagram is shown below. 0.6 0.1 0.4 A 0.2 0.6 0.8 (H 0.6 0.5 B 0.9 cycle time is determined to be 1.8 minutes. How would the line be balanced by choosing the assignable task having the longest task time first? In the table below. If your answer is zero, enter "o". Round your answers to one decimal place. Station Tasks Total Time Idle Time 1 B,A,C,D 2 E,F