Question: Chemical engineering process control course The third problem involves a gas distribution system with three consumers, S 2 , S 1 , and S 3

Chemical engineering process control course
The third problem involves a gas distribution system with three consumers, S2, S1, and S3. In this system, the incoming gas is pressurized by compressor C1 and enters the distribution line. The compressor is powered by a gas turbine (T1), utilizing a portion of the incoming gas. Design the control system structure for this process to achieve the following objectives:
A. Ensure gas pressure at all consumption points is consistently above 500 psi.
B. Maintain the gas turbine's rotation speed within the range of 300 to 700 revolutions per minute.
Note: No new sensors or control valves can be added to the flowsheet.
 Chemical engineering process control course The third problem involves a gas

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!