Question: Complete what is inputted below: Complete this table (the column on the right) of calculations for the Scanner Project: Scanner Project Indices and Variances Scanner

Complete what is inputted below: Complete thisComplete what is inputted below:

Complete this table (the column on the right) of calculations for the Scanner Project:

Scanner Project Indices and Variances

Scanner project overall CPI

Scanner project overall SPI

Scanner project overall PCIB

Scanner project overall PCIC

Scanner project overall VAC

(hint- remember that the table for the case in the text is shown in thousands of dollars)

Coding team SV

(hint- the Coding Team is assigned to 2 work packages on the report: Code Software and Code Interfaces)

Coding team CV

What is the current Utilities deliverable (U 1.0) budget forecast at completion?

What is the current Operating System deliverable (OP 1.0) budget forecast at completion?

Write a brief status report paragraph for the Scanner Project stakeholders. Outline what is going well, what is not going so well, and what possible options could be utilized to improve the status of the project:

Scanner Project You have been serving as Electroscan's project manager and are now well along in the project. Develop a narrative status report Page 521 for the board of directors of the chain store that discusses the status of the project to date (see Table C13.3) and at completion. Be as specific as you can, using the numbers given and those you might develop. Remember, your audience is not familiar with the jargon used by project managers and computer software personnel; therefore, some explanation may be necessary. Your report will be evaluated on your detailed use of the data, your total perspective of the current status and future status of the project, and your recommended changes (if any). TABLE C13.3 Electroscan, Inc. 555 Acorn Street, Suite 5 Boston, Massachusetts 29 In-store Scanner Project (thousands of dollars) Actual Progress as of January 1 Name PV EV AC SV CV BAC EACH Scanner project 420 395 476 -25 -81 915 1103 213 15 25 8 40 260 20 30 10 40 30 30 100 330 20 70 30 92 20 30 10 2 0 30 0 195 105 20 45 25 20 20 130 30 45 H 1.0 Hardware H 1.1 Hardware specifications (DS) H 1.2 Hardware design (DS) H 1.3 Hardware documentation (DOC) H 1.4 Prototypes (PD) H 1.5 Test prototypes (T) H 1.6 Order circuit boards (PD) H 1.7 Preproduction models (PD) OP 1.0 Operating system OP 1.1 Kernel specifications (DS) OP 1.2 Drivers OP 1.2.1 Disk drivers (DEV) OP 1.2.2 I/O drivers (DEV) OP 1.3 Code software OP 1.3.1 Code software (C) OP 1.3.2 Document software (DOC) OP 1.3.3 Code interfaces (C) OP 1.3.4 Beta test software U 1.3.4 U 1.0 Utilities U 1.1 Utilities specifications (DS) U 1.2 Routine utilities (DEV) U 1.3 Complex utilities (DEV) U 1.4 Utilities documentation (DOC) U 1.5 Beta test utilities U () S 1.0 System integration S 1.1 Architecture decisions (DS) S 1.2 Integration hard/soft (DEV) S 1.3 System hard/software test (T) S 1.4 Project documentation (DOC) S 1.5 Integration acceptance testing (U) 25 88 20 30 6 2 0 30 0 150 20 55 30 25 75 20 30 25 O 108 20 20 60 8 8 0 49 9 30 0 10 0 72 15 25 5 2 0 25 0 196 15 76 45 45 31 105 40 40 25 40 0 148 15 35 90 8 0 60 7 7 45 0 8 0 -4 0 0 -4 0 0 0 o -45 0 10 10 5 5 5 -55 -10 -15 -30 0 21 0 0 30 -9 0 3 3 0 0 5 5 0 -2 0 16 5 5 1 0 O 5 0 -46 ac E 5 -21 21 15 -15 -6 -30 -20 5 -15 O 0 -40 5 -15 -30 0 O -11 2 2 -15 0 2 0 25 100 431 15 97 60 27 37 336 200 42 40 30 240 100 50 60 55 96 30 0 87 20 20 30 17 0 46 9 25 0 O 12 0 200 20 20 100 20 40 125 10 50 20 15 30 30 274 15 35 150 20 40 153 g 8 75 20 12 30

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!