Question: Compress the project timelines in problems 1 and 2 using the least cost method one unit at a time. Reduce the schedule until you reach

Compress the project timelines in problems 1 and

Compress the project timelines in problems 1 and 2 using the least cost method one unit at a time. Reduce the schedule until you reach the crash point (shortest duration possible) of the network. For each duration reduction identify what activity(s) was crashed and the new adjusted total cost. Question 1 Activity Normal Time Normal Cost Collow A B Crash Cost (slope) 0 100 50 60 70 90 Maximum Crash Time 0 2 1 1 2 1 1 3 4 3 4 3 100 150 200 200 200 150 D E F al B D BB 3 3 A F 1 3 E 4 4