Question: COMPUTER PROGRAMMING GROUP PROJECT (40%) Operating conventional machines are full of challenges such as difficult to estimate part machining time, total energy consumption, total operation

 COMPUTER PROGRAMMING GROUP PROJECT (40%) Operating conventional machines are full of

COMPUTER PROGRAMMING GROUP PROJECT (40%) Operating conventional machines are full of challenges such as difficult to estimate part machining time, total energy consumption, total operation cost, by-products or solid waste generation, and estimated productivity per day. Your team is assigned to assist Super Metal Company to improve their production planning. Your team need to develop 3 PROGRAM to guide their operator in using conventional machining for selected metal parts in lathe machine, milling machine, and drilling machine. Your tasks: 1. Understanding the conventional machines and its operations in Super Metal Company (Refer to online infor for conventional lathe, milling, drilling machine). 2. Propose THREE(3) part design that able to be done by above machines (1 machine 1 part design). 3. Propose the STEPS involved to machine a raw material until you get the proposed part design. 4. From the suggested steps, DEVELOP 3 COMPLETE PROGRAMS to assist the operator in machining operations planning (1 program for 1 machine type with 1 part design). 5. Each program ANALYSIS MUST CONSIST: total part machining time, total energy consumption, total operation cost, by-products or solid waste generation in kg, and estimated productivity per 8 hours working. 6. Your program MUST shows the DETAILS STEPS and PARAMETERS & CORRECT CALCULATION to machine raw material until you get the end product (part design). Your program: 1. The conventional machines specifications and limitations (e.g. size of allowed material dimensions) 2. Details steps/guidelines to machine until you get a part design (e.g. facing reducing diameter threading). 3. Each program must consist AT LEAST 5 operational steps to complete a part machining. 4. Each program MUST consists at least 2"function", 2"for looping, Decision Operators and Array. 5. Each program MUST shows the analysis results: part machining time, total energy consumption, total operation cost, by-products or solid waste generation, and estimated productivity per day. 6. USE ONLY the codes you have learnt in BDA24202. COMPUTER PROGRAMMING GROUP PROJECT (40%) Operating conventional machines are full of challenges such as difficult to estimate part machining time, total energy consumption, total operation cost, by-products or solid waste generation, and estimated productivity per day. Your team is assigned to assist Super Metal Company to improve their production planning. Your team need to develop 3 PROGRAM to guide their operator in using conventional machining for selected metal parts in lathe machine, milling machine, and drilling machine. Your tasks: 1. Understanding the conventional machines and its operations in Super Metal Company (Refer to online infor for conventional lathe, milling, drilling machine). 2. Propose THREE(3) part design that able to be done by above machines (1 machine 1 part design). 3. Propose the STEPS involved to machine a raw material until you get the proposed part design. 4. From the suggested steps, DEVELOP 3 COMPLETE PROGRAMS to assist the operator in machining operations planning (1 program for 1 machine type with 1 part design). 5. Each program ANALYSIS MUST CONSIST: total part machining time, total energy consumption, total operation cost, by-products or solid waste generation in kg, and estimated productivity per 8 hours working. 6. Your program MUST shows the DETAILS STEPS and PARAMETERS & CORRECT CALCULATION to machine raw material until you get the end product (part design). Your program: 1. The conventional machines specifications and limitations (e.g. size of allowed material dimensions) 2. Details steps/guidelines to machine until you get a part design (e.g. facing reducing diameter threading). 3. Each program must consist AT LEAST 5 operational steps to complete a part machining. 4. Each program MUST consists at least 2"function", 2"for looping, Decision Operators and Array. 5. Each program MUST shows the analysis results: part machining time, total energy consumption, total operation cost, by-products or solid waste generation, and estimated productivity per day. 6. USE ONLY the codes you have learnt in BDA24202

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!