Question: Consider a continuous review inventory system with a lead time of two weeks. If the standard deviation of demand during lead time is 212.132 and
Consider a continuous review inventory system with a lead time of two weeks. If the standard deviation of demand during lead time is 212.132 and the desired order-cycle service level is 91%, what should the safety stock equal? Round your answer to the nearest whole number.
Group of answer choices
A229
B None
C244
D284
E272