Question: 1) Consider a continuous review inventory system with a lead time of two weeks. If the standard deviation of demand during lead time is 212.132
1)
Consider a continuous review inventory system with a lead time of two weeks. If the standard deviation of demand during lead time is 212.132 and the desired order-cycle service level is 91%, what should the safety stock equal? Round your answer to the nearest whole number.
Group of answer choices
229
244
none of these
284
272
2)
The fixed and variable costs for the three potential manufacturing plant sites for basket weaver are shown below.
| Site | Fixed Cost Per Year | Variable Cost Per Unit |
| A | $2,500,000 | $15 |
| B | $2,000,000 | $20 |
| C | $1,5000,000 | $25 |
| D | $3,000,000 | $16 |
For a production of 75,000 units, which site is the best based on total cost?
Group of answer choices
site B
site D
site A and site B
site C
site A
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts