Question: Consider a continuous review inventory system with a lead time of two weeks. If the standard deviation of demand during lead time is 212.132 and
Consider a continuous review inventory system with a lead time of two weeks. If the standard deviation of demand during lead time is 212.132 and the desired order-cycle service level is 86%, what should the safety stock equal?
Group of answer choices
115
182
229
171
458
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
