Question: Consider a simple two - station line as shown in below ( Two - station line with a finite buffer ) . Unlimited raw materials

Consider a simple two-station line as shown in below (Two-station line with a finite buffer). Unlimited raw materials From HW#2, we have computed the following: TH(b=12) CT(b-(b=12)= WIP (b=12) Both machines take 20 minutes per job and have SCV-1. The first machine can always pull in material, and the second machine can always push material to finished goods.