Question: Consider a two - station serial production line. The rst station consists of a single machine with a mean processing time of 3 hours and

Consider a two-station serial production line. The rst station consists of a single
machine with a mean processing time of 3 hours and a standard deviation of 9 hours. At the
second station, there are two identical machines, each with a mean and standard deviation
of 5 hours and 2 hours, respectively, for the processing time.
a)( pts) What is the highest arrival rate that this system can handle?
b)( pts) Using analytical approximations, calculate the average cycle time for the system
assuming that the inter-arrival process is exponential with a rate of 0:25 jobs/hour.
c) pts) Suppose the two machines in the second station is replaced by a single machine
that is twice faster such that the mean process time is 2:5 hours. Assume that the
standard deviation stays the same. How will the CT change? Show your calculations
clearly. Compare the cycle times in parts b) and c) and explain the reason(s) for the
dierence.
d)( Suppose that the production line in part b) is reversed so that station 2 replaces

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!