Question: Consider the assembly line below. The three fabrication operations run in parallel, such that each batch of 20 units only needs to go through one
Consider the assembly line below. The three fabrication operations run in parallel, such that each batch of 20 units only needs to go through one of the three fabrication operations. After that, each batch needs to go through both assembly operations, which occur simultaneously (specifically, some components for each unit are assembled in the Assembly 1 area while others are assembled in the Assembly 2 area). The units are packaged and made ready for shipment in the final stage. What is the bottleneck time per batch of this operation?

Please answer question above. Thank you!:)
Fabrication 18 nin/batch Assenbly 1 8 min/batch Fabrication 18 min/batch Packaging 4 min/batch Assenbly 2 2 min/batch Fabrication 18 min/batch A. 4 min. B. 18 min. C. 2 min. D. 6 min. E. 10 min. F. 8 min. G. 54 min. H. 5 min. I. 7 minStep by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
