Question: consider the following processes: 1. Draw the time line scheduling using round robin algorithm with quantum of time 5 ms (4 marks) 2. Calculate the

 consider the following processes: 1. Draw the time line scheduling using
round robin algorithm with quantum of time 5 ms (4 marks) 2.

consider the following processes: 1. Draw the time line scheduling using round robin algorithm with quantum of time 5 ms (4 marks) 2. Calculate the waiting time marks) 3. Calculate the turn arround time (2 12 marks) Processes AT( ms) Turnarround time PI P2 P3 P4 P5 P6 P7 P8 NONDON BT ( ms) Waiting time 17 8 9 4 5 9 8 9 10 P9