Question: Consider these two statements about batching in a system with 4 subsequent stages: 1) When there are LARGE setup times at each stage, more smaller
Consider these two statements about batching in a system with 4 subsequent stages: 1) When there are LARGE setup times at each stage, more smaller batches are better than fewer larger batches. 2) When the throughput time of the LAST item is most important and there is some setup time at each stage, then a batch size of 1 is the best decision. Group of answer choices
A - Statement 1 is true, statement 2 is false
B - Both statements are true
C - Neither statement is true
D - Statement 1 is false, statement 2 is true