Question: Course : Business Project Management I need the Work Breakdown Structure WBS Subject: Best friend's wedding scope I have uploaded 2 samples. If you can
Course : Business Project Management
I need the "Work Breakdown Structure" WBS
Subject: Best friend's wedding scope
I have uploaded 2 samples. If you can prepare an example like this, you will help me.


Snapshot from Practice_Saone Statement PROJECT OBECIME Toonstruct a high quality, austom home within five months at cost notto exceed $350,000. 3. Exterior wall insulation must meet an "R"factor of 21. 4. Ceiling insulation mustmeet an "R"factor of 38. 5 Floor insulation must meetan "A" factor of 25. 6. Garage will accommodate two large size cars and one 20 foot Winnebago. 7. Structure must pass seismic stability codes. DELNERABLES . . . A2200-square foot, 2/bath, 3 bedroom, finished home. Afinished garage, insulated and sheetrocked. Kitchen appliances to include range, oven, microwave, and dishwasher. High-efficiency gas fumace with programmablethermostat LIMTSAND EXCLUSONG . MESTONES 1,60 1. Permits approved-March 5 2 Foundation poured-March 14 3. Drywall in. Framing sheathing, plumbing, electrical, and mechanical inspections passed May 25 4. Finalinspection June 7 1. The home will be builtto the specifications and design of the original blueprints provided by the customer. 2 Owner responsible for landscaping. 3. Refrigerator is not induded among kitchen appliances. 4. Air conditioning is not included but prewiring is included 5. Contractor reserves the right to contract out services. 6. Contractor responsible for suboontracted work. 7. Site work limited to Monday through Friday, 800AM. to 6:00PM TEC-NCAL REQUROVENTS best friends wedding scope GUSTAVBRRMBW 1. Home must meet local building codes. John and Joan Smith 2 All windows and doars mustpass NACclass40 energy ratings. Best friend's Wedding SCOPE STATEMENT Project Objective Limits and Exclusions To arrange a wedding that have at least 600 guests with cost not to exceed $2000. 1. The bride and groom determine the wedding date 2. The bride and groom choose the guests 3. Garden capacity is only 600 people 4. Food suitable for guests with have allergies 5. No indoor space for bad weather 6. No kids after 10 pm 7. Red dresscode for bridesmaids Deliverables a garden with floral ornaments Wedding cake, cocktail and snacks table and chair wedding photographer music and organization . . Milestones 1. Wedding invitation sent to the invitees 2. negotiated with the deliverers Requirements Customer Review Close relatives of the bride and groom 3. supply of cable and sound system for the music system 4. chair and table dressing 5. organizing the dining table 6. organizing the menu
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
