Question: Course : Business Project Management I need the Work Breakdown Structure WBS Subject: Best friend's wedding scope I have uploaded 2 samples. If you can

Course : Business Project Management

I need the "Work Breakdown Structure" WBS

Subject: Best friend's wedding scope

I have uploaded 2 samples. If you can prepare an example like this, you will help me.

Course : Business Project ManagementI need the "Work Breakdown Structure" WBSSubject: Bestfriend's wedding scopeI have uploaded 2 samples. If you can prepare an

Best friend's Wedding SCOPE SMJjEMEChla-jrective Limits and Exclusions To arrange a wedding that have at least 600 1. The bride and groom determine the guests with cost not to exceed $2000. wedding date 2. The bride and groom choose the Deliverables guests a garden with oral ornaments . Garden capacity is only 600 people Wedding cake, cocktail and snacks . Food suitable for guests with have table and chair allergies wedding photographer . No indoor space for bad weather music and organization . No kids after 10 pm Red dresscode for bridesmaids Milestones 1. Wedding invitation sent to the invitees 2. negotiated with the deliverers Requirements Customer Review Close relatives of the bride and groom 3. supply of cable and sound system for the music system _ chair and table dressing organizing the dining table organizing the menu Snapshot from Practice scope Statement PROJECT OBJECTME 3. Exterior wall insulation must meet an "R" factor of 21. To construct a high-quality, custom home within 4. Ceiling insulation must meet an "R" factor of 38. five months at cost notto exceed $350,000. 5. Floor insulation must meet an "A" factor of 25. DELIVERABLES 6. Garage will accommodate two large-size cars and one 20- foot Winnebago. . A2,200-square-foot, 2vbath, 3-bedroom, finished home. 7. Structure must pass seismic stability codes. . Afinished garage, insulated and sheetrocked. . Kitchen appliances to include range, oven, microwave, and dishwasher. LIMTSAND EXCLUSIONS . High-efficiency gas fumace with programmablethermostat. 1. The home will be builtto the specifications and design of the original blueprints provided by the customer. MILESTONES 2 Owner responsible for landscaping. 1. Permits approved-March 5 3. Refrigerator is not induded among kitchen appliances. 2 Foundation poured-March 14 4. Air conditioning is not included but prewiring is included. 3. Drywall in. Framing, sheathing, plumbing, electrical, and 5. Contractor reserves the rightto contract out services. mechanical inspections passed- May 25 6. Contractor responsible for subcontracted work. 4. Final inspection- June 7 7. Site work limited to Monday through Friday, 800AM. to 6:00PM TECHNICAL REQUIREMENTS CUSTOMER REVIEW 1. Home must meet local building codes. John and Joan Smith 2 All windows and doors must pass NFRC class40 energy ratings

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!