Question: Course Learning Outcomes:CLO 3 : Students should be able to PREPARE interim certificates as commonly conducted byprofessional quantity surveyors.Instruction:Based on the information given, prepare a

Course Learning Outcomes:CLO3 : Students should be able to PREPARE interim certificates as commonly conducted byprofessional quantity surveyors.Instruction:Based on the information given, prepare a draft Interim Certificate No.13 for the following project.All calculations and the draft certificate must be shown and attached. You may ask your lecturerif any insufficient information is required.A - PARTICULARS OF CONTRACTForm of Contract : PAM CONTRACT 2018Project Title : Proposed 2-storey Fitness Centre at BandarBaru Seri Iskandar, Perak.Contract Sum : RM1,377,425.00Date of Site Possession : 1 September 2023Date of CompletionExtension of Time granted::30 September 2024Until 19 October 2024Date of Valuation : 29 October 2024Liquidated and Ascertained Damages : RM300.00 per dayDefects Liability Period : 12 monthsPeriod of Interim Certificate : 1 month% of Certified Value Retained : 10% of work doneLimit of Retention Fund : 5% of Contract SumAmount Previously Certified : RM850,000.00B - PRELIMINARIES (As per Contract)ITEM DESCRIPTION AMOUNT (RM)1 Signboards 2,000.002 Light & power 10,000.003 Water for the works 15,000.004 Maintenance of public roads 3,000.005 Contractor all risk (CAR)10,000.006 As-built drawing 3,000.007 Tools and equipment 20,000.008 Site telephone 8,500.009 Temporary hoardings 28,000.0010 Cleaning of site 5,500.00Note: Records on receipts of insurances CAR received RM8,000.002C BUILDING WORKSITEM DESCRIPTION AMOUNT (RM)%OFWORKDONE1 Piling 42,037.501002 WBLFF 43,857.50903 Frame 49,329.301004 Upper Floor 23,751.501005 Roof 129,971.401006 Staircase 8,029.901007 External Walls 11,931.701008 Internal Walls & Partitions 15,724.551009 Window 49,635.008010 Door 18,288.008011 Int. Wall Finishes 18,659.509012 Int. Floor Finishes 5,906.009013 Int. Ceiling Finishes 14,107.009014 External Finishes 18,791.508015 Fittings and Furnishings 6,220.007016 Sanitary Fittings 24,894.007017 BWIC with services 4,157.0080D EXTERNAL WORKSITEM DESCRIPTION AMOUNT (RM)%OFWORKDONE1 Earthworks 45,316.001002 Soil Drainage 23,713.251003 Surface Water Drainage 21,648.601004 Road & Carparks 108,769.50805 Water Reticulation 29,179.301006 Street Lightings 10,300.0050E MECHANICAL AND ELECTRICAL WORKSITEM DESCRIPTION AMOUNT (RM)%OFWORKDONE1 All Mechanical Works 89,652.00902 All Electrical Works 150,555.0090F a) PRIME COST SUMITEM DESCRIPTION ALLOWEDFIGURE (RM)ACCEPTEDFIGURE (RM)%OFWORKDONE1 Built in Furniture 200,000.00185,900.0090- Profit @ 2%4,000.00- Attendance 4,000.00b) PROVISIONAL SUMITEM DESCRIPTION ALLOWEDAMOUNT (RM)1 Landscaping Works 60,000.002 Signages 10,000.003 Contingencies 30,000.003G - MATERIALS ON SITEITEM DESCRIPTION UNIT QTY RATE (RM)1 PVC Sheets Pcs 3020.002 Crusher Run M34080.003 Sand M31530.004 Aggregate M32045.805 Plywood for formwork Pcs 5060.00H VARIATION ORDERSUMMARY OF VARIATIONSBuilding works.a) Variation Order No.1(Homogeneous floor tiles)Omission: RM 4,500.00Addition: RM 6,500.00b) Variation Order No.2(Internal Wall Finishes)Omission: RM 3,300.00Addition: RM 2,000.00c) Variation Order No.3(Internal Ceiling Finishes)Omission: RM 10,300.00Addition: RM 15,000.00d) Variation Order No.4(Plastering)Omission: RM 4,300.00Addition: RM 6,000.00J - PROVISIONAL SUMThe final contract figure for Provisional Sum undertaken by the main Contractor has been agreedas follows :ITEM DESCRIPTION FINAL AMOUNT(RM)%OFWORKDONE1 Landscaping Works 50,000.00502 Signages 8,000.0003 Contingencies 28,000.0020Note: - All variations on building works are completed prior to the site valuation.- Deduction of Non-Compliance Report for poor alignment of brick wall to be included in thispayment RM1,500.00
answer my quantity survey questions. and show me the calculation answer

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!