Question: Create a network diagram and calculate ES, LF, SL for each activity Create a Gantt chart showing non-constrained time-phased resources scheduled in each time period.
Create a network diagram and calculate ES, LF, SL for each activity
Create a Gantt chart showing non-constrained time-phased resources scheduled in each time period. Calculate ES, LF, SL for each activity
Copy the Gantt chart from #2 and develop a resource-constrained schedule in the Gantt chart. No splitting. Recalculate ES, LF, SL for each activity.
Recreate the network diagram from the constrained resource schedule
Create a responsibility matrix (pg 122) for this project

There are two backhoes available, nicknamed Ruby and Wanda 1 Create a network diagram and calculate ES, LF, SL for each activity (8 points) 2 Create a Gantt chart showing non-constrained time-phased resources scheduled in each time period. Calculate ES, LF, SL for each activity ( 7 points) 3 Copythe Gantt chart from #2 and develop a resource constrained schedule in the Gantt chart. No splitting. Recalculate ES, LF, SL for each activity. (20 points) 4 Recreate the network diagram from the constrained resource schedule(10 points) 5. Createaresponsibility matriang1221 for this project 15 points) ESIDEF SL Resource LS DUR LF Network Diagram ID Res Predessor Dur ES LF SL A B D E F 1 None 1 None 1 None 1 AB 2 B,C 2 DE 1 2 3 2 4 2 ID Res Predessor Dur ES LF SL Gantt 0 1 2 3 6 7 8 9 10 11 Non-constrained Before A B D E F 1 None 1 1 None 2 1 None 1 AB 2 2 B,C 2 DE 2 Resource scheduled Resource available OO 0 0 0 00 0 2 Gantt 0 1 2 3 4 5 6 7 10 11 Constrained After souw ID Res Predessor Dur ES LF SL A 1 None 1 B 1 None 2 1 None 3 D 1 AB 2 E 2 B,C 4 F 2 DE 2 Resource scheduled Resource available Priorities 1: Minimum slack 2: Smallest duration 3: Lowest ID letter 0 0 0 2. 00000000 0 ESID EF SL Resource LS DUR LF Resource constrained network diagram A ID Res Predessor Dur ES LF SL A B D E F 1 None 1 None 1 None 1 AB 2 B,C 2 DE 1 2 3 2 4 2 Responsibility Matrix Backhoes Available Vask Ruby Wanda B D E F There are two backhoes available, nicknamed Ruby and Wanda 1 Create a network diagram and calculate ES, LF, SL for each activity (8 points) 2 Create a Gantt chart showing non-constrained time-phased resources scheduled in each time period. Calculate ES, LF, SL for each activity ( 7 points) 3 Copythe Gantt chart from #2 and develop a resource constrained schedule in the Gantt chart. No splitting. Recalculate ES, LF, SL for each activity. (20 points) 4 Recreate the network diagram from the constrained resource schedule(10 points) 5. Createaresponsibility matriang1221 for this project 15 points) ESIDEF SL Resource LS DUR LF Network Diagram ID Res Predessor Dur ES LF SL A B D E F 1 None 1 None 1 None 1 AB 2 B,C 2 DE 1 2 3 2 4 2 ID Res Predessor Dur ES LF SL Gantt 0 1 2 3 6 7 8 9 10 11 Non-constrained Before A B D E F 1 None 1 1 None 2 1 None 1 AB 2 2 B,C 2 DE 2 Resource scheduled Resource available OO 0 0 0 00 0 2 Gantt 0 1 2 3 4 5 6 7 10 11 Constrained After souw ID Res Predessor Dur ES LF SL A 1 None 1 B 1 None 2 1 None 3 D 1 AB 2 E 2 B,C 4 F 2 DE 2 Resource scheduled Resource available Priorities 1: Minimum slack 2: Smallest duration 3: Lowest ID letter 0 0 0 2. 00000000 0 ESID EF SL Resource LS DUR LF Resource constrained network diagram A ID Res Predessor Dur ES LF SL A B D E F 1 None 1 None 1 None 1 AB 2 B,C 2 DE 1 2 3 2 4 2 Responsibility Matrix Backhoes Available Vask Ruby Wanda B D E F