Question: Create a work breakdown for a water main project with 1 0 0 0 f t of pipe, 3 valves, a fire hydrant assembly, in

Create a work breakdown for a water main project with 1000ft of pipe, 3 valves, a fire hydrant assembly, in a roadway (so repave). See if you can find such a project and gather some information/photos.
Outline the 16 section of work in a standard set of specifications provide an example of each section and the work covered.
 Create a work breakdown for a water main project with 1000ft